PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Electrical lighting control boxes at the 2nd floor Facing East.jpg Installed exterior framing at the 1st floor Facing South.jpg Installing Fire Alarmn boxes at the 2nd floor Facing North.jpg Installing panel boards at the 1st floor Electrical Room Facing East.jpg Motorized damper controllers.jpg Block work at the detention cells divider wall Facing East.jpg Closing up the block wall at the 1st floor Sally Ports Facing North.jpg Fire Alarmn boxes at the 3rd floor Facing East.jpg Installing bathroom carriers at the 4th floor Facing West.jpg
Previous pageNext page Motorized damper controllers
Motorized damper controllers